PlasticMachHubInjection molding, extrusion, blow molding, rubber machines, molds, and auxiliaries for global industrial buyers.
Advanced Blow Molding Machine for Efficient Plastic Manufacturing Solutions
Port And Wharf Equipment

Advanced Blow Molding Machine for Efficient Plastic Manufacturing Solutions

This detail page turns one product record into a narrower sourcing decision with clearer category fit, adjacent routes and RFQ-ready context.

Quote on request

Advanced | Applications and Buyer Notes

Advanced is organized as a sourcing-ready Port And Wharf Equipment reference. The page combines visible product or company data with structured procurement cues so buyers can compare application fit, specifications, quantity, quality requirements and lead-time

Applications

  • Initial shortlist building for related product or supplier options.
  • Specification and application fit review before bulk purchasing.
  • Category, keyword and detail-page comparison before sending an RFQ.

Key specifications

Category
Injection Molding EquipmentBased on visible page data; confirm exact value in the RFQ.
Brand
Jiangxi Zhongyan InBased on visible page data; confirm exact value in the RFQ.
Unit
setBased on visible page data; confirm exact value in the RFQ.
Air Source(High Pressure Air Consumption
Low Pressure Compressed Air Presser 8~10barBased on visible page data; confirm exact value in the RFQ.
Application
Food and beverage processingBased on visible page data; confirm exact value in the RFQ.
Automatic Grade
AutomaticBased on visible page data; confirm exact value in the RFQ.
Bottle Spacing
114.3mmBased on visible page data; confirm exact value in the RFQ.
Bottom mold stroke
Mold connectionBased on visible page data; confirm exact value in the RFQ.

Buyer tips

  • State quantity range and split-delivery needs before price comparison.
  • Add certification, material or inspection standards when they affect acceptance.
  • For time-sensitive projects, include target arrival date and destination.
  • For special applications, describe operating condition, installation environment and duty cycle.

FAQ

What should buyers confirm first?

Confirm application, specification, quantity, destination and lead-time requirements before comparing offers.

Can buyers inquire when specs are incomplete?

Yes. Add model, material, size, use case and inspection needs in the RFQ to make replies comparable.

How should this listing be evaluated?

Check title, category, specifications and related keywords against the actual sourcing requirement.

Source mix: ugc

Product sourcing profile

CategoryPort And Wharf Equipment
Inquiry workflowPlatform RFQ workflow
AvailabilityInquiry required
Updated2026-05-06

Product introduction

Home Manufacturing & Processing Machinery Plastic Machinery Bottle Blowing Machine Blow Molding Machine Advanced Blow Molding Machine for Efficient Plastic Manufacturing Solutions US$89,000.00 1 Set-led product discovery for buyers looking for injection molding equipment options. The page is organized around specification review, application fit, and inquiry-ready comparison.When evaluating this product, buyers should confirm application fit, required performance range, installation environment, lead time, documentation, and whether the supplier can support OEM or project quotations. Current vertical focus: injection molding, extrusion, blow molding, rubber machines, molds, and auxiliaries sourcing and rfq-ready export supply platform.

Selection and RFQ points

Review material fit, application context, alternatives and RFQ detail before comparing related product paths.

Material fit Advanced Blow Molding Machine

Confirm material, size, finish, tolerance and processing needs before price comparison.

Application fit application, operating environment and usage frequency

Add the target application and operating context so related products can be compared correctly.

Alternative path Port Wharf Equipment

Use nearby materials, equipment types or category pages when this record is close but not exact.

RFQ detail Quantity, destination, timing

Include quantity, destination, target delivery window, packaging and any technical constraints.

Key specifications

CategoryInjection Molding Equipment
BrandJiangxi Zhongyan In
Unitset
Air Source(High Pressure Air Consumption Depends on PET Bottle VLow Pressure Compressed Air Presser 8~10bar
ApplicationFood and beverage processing
Automatic GradeAutomatic
Bottle Spacing114.3mm
Bottom mold strokeMold connection
CategoryInjection Molding Equipment
CompositionItems Technical Parameters
Cooling Water (Water Temperature≤18ºC)Pressure 3~4bar
CustomizationAvailable
Electrical ParametersVoltage 380V
Equipment DimensionsMain Machine(L×W×H)mm 4100 mm× 2100 mm× 2100 mm
Feature Highlightspneumatic, digital, automatic, precision
Flow Rate5m3/h
Frequency50Hz
Heating SectionUnit 4
Heating Spacing114.3mm
High Pressure Compressed Air Consumption3.0 ~ 6.0 m3/min
High Pressure Compressed Air Pressure2 6~ 35 bar
Installed Power72kw
Low Pressure Compressed Air Consumption0 .5~ 1.0 m3/min
Maximum Product DiameterΦ 11 0 mm
Maximum Product Height< 3 0 0mm
Model NO.ZY-04V1-114.3mm-9
Mold Clamping Stroke(Servo Mot)1 2 0 mm
Number of Heating Lamp Layers8
Number of Mold4
Number of Preform Holders76
Operating Power20 ~40kw/h
OriginChina
Perform lo a der Machine(L×W×H)mm3100 mm× 3100 mm× 2700 mm
Product ConditionsMaximum Product Volume 2L
Product TitleAdvanced Blow Molding Machine for Efficient Plastic Manufacturing Solutions
Product bottle neck dimensionsΦ20mm ~ Φ38mm
Production Capacity3 0 00~ 50 00
SpecificationZY-04V1-114.3mm-9
Standard Mold Thickness200mm
TrademarkZHONGYAN
TypeExtrusion Bottle Blowing Machine
US$89,000.001 Set (MOQ)
Warranty1 Year
WeightMain Machine. 5 T

Keyword evidence

Only terms with visible evidence in this listing are shown here.

Product sourcing keywords

These terms come from the title, visible copy and specifications, and link into matching aggregate pages.

Related keyword paths

Grouped by the product keyword that generated the related path.

SOURCING DECISION BRIEF

Advanced Blow Molding Machine for Efficient Plastic Manufacturing Solutions sourcing decision brief

This detail page turns one product record into a narrower sourcing decision with clearer category fit, adjacent routes and RFQ-ready context.

Category
Injection Molding Equipment
Price status
Quote on request
Inquiry model
Structured product RFQ with quantity, destination and technical requirements.
Availability
Confirm by inquiry
Sourcing lens
Product detail to shortlist decision
Primary compare
Category, Brand, Unit
Record focus
Advanced Blow Molding Machine For Efficient Plastic Manufacturing Solutions
Category focus
Port And Wharf Equipment
Buyer checklist
  • Category fit: Confirm whether the product belongs to the right category and nearby application path before outreach.
  • Specification depth: Review the visible specifications and convert missing fields into a clearer RFQ requirement set.
  • Route expansion: Use adjacent category, solution and procurement routes before settling on one detail page.
How should buyers use this detail page?

Use the detail page as a product-fit checkpoint. Confirm category placement, visible specifications and adjacent sourcing paths before sending an RFQ.

What should buyers compare first?

Compare the visible specifications, category fit and the nearest application or solution routes before asking for supplier options.

PlasticMachHub related sourcing paths

PlasticMachHub procurement phrases

PlasticMachHub project-fit checks

Application Confirm Application before comparing offers or moving the inquiry forward.
Country Confirm Country before comparing offers or moving the inquiry forward.
Capacity Confirm Capacity before comparing offers or moving the inquiry forward.
Material Confirm Material before comparing offers or moving the inquiry forward.
Application route Use Application to compare adjacent options instead of relying on one broad title match.
Country route Use Country to compare adjacent options instead of relying on one broad title match.

PlasticMachHub related product samples

Procurement notes

If visible specifications are still thin, add model, material, interface, quantity, application fit, destination and target lead time before comparing quotes.

Next sourcing actions