PlasticMachHubInjection molding, extrusion, blow molding, rubber machines, molds, and auxiliaries for global industrial buyers.
PA66 High-Temp Sensor Molds for Engine Bay, Short Sample Time
Mold Temperature Controllers

PA66 High-Temp Sensor Molds for Engine Bay, Short | RFQ Sourcing Details

Mold Temperature Controllers · Quote on request

This is a product procurement detail page: check specs, images, category context and related sourcing paths before sending an RFQ.

Quote on request

Product specs

Unitset
CategoryMold Temperature Controllers
CategoryMold Temperature Controllers
AvailabilityInquiry required
Updated2026-05-26

Buyer's Digest

Use this page as a product-first sourcing checkpoint before sending an RFQ. Category: Mold Temperature Controllers. Confirm application fit, capacity, materials, destination, lead time and compliance requirements before comparing suppliers.

Original product description

Raw Materials ABS, PP, PC, PA66+30GF, PVC, POM, TPE, TPV, ASA and so on Die steel P20,P20HH ,H13,420 ,2344,2311 Mold NO.

Plastic Injection Moldings Injection Molding Machine Single color, double injection Hot-runner Mold-Master, Incoe, Yudo, Hasco, D.M.E., Husky and so on Surface Treatment Polishing,Mirrror Polishing,Sand Blasting,Painting and so on Mold Base LKM,HASCO, DME and so on Runner Hot Runner\Cold Runner Trademark Customized Design Software Auto CAD,UG,Pro-E Certification TS16949,ISO9001 Transport Packet Wooden Box or Carton Box Production Capacity 500 sets/year molds Color Can be customized Mold Processing Equipment CNC,EDM,Wire cutting,Drill hole machine,Grinding machine,Milling machine,Turning-lathe,Crane,CMM machine,2D projector,Engraving machine,Fitting machine,Injection machine Be able to product Plastic Injection Mold,Plastic Mould,Plastic Tooling,Plastic Part,Plastic Cover,Die Casting,CNC Machining,Plastic Mold,Injection Moulding,Rapid Mold & Prototyping.

Die structure Mold base Hot runner/ Cold sprue Cavity Core Water line/Cooling system Slider/Cam Lifter Ejector pin FA ice after you receive the RFQ? A2:Normal we provide the quotation to the customer in three working days;if the project is very urgently, then we will try our best to provide it within one day.

Q3:What type of molds, sizes and weight can you build? A3:Leading productions are Auto Parts (such as lens, housing and cover components), Building Parts, Electronics parts, Home Appliance and Medical Equipment. The max size of mold we made can be 2000x300x300(cm) and max weight can be 15T.

Q4: Did your factory past any Management System? A4:Yes, we have. We have held ISO9001 Version 2000/TS16949 Q5: How many employees are there in your factory? A5:There are about 150 employees in our factory. Q6: What are you professionalizing in mold making? A6:Our leading product is the Auto Part, Electronics part.

Delivery service We will pack the mould with an insecticidal wood case, and fix it with iron frame.Then we will put the electrodes and the spare parts which are easy damaged into the wood case together and will send all the related drawings of Mould, Data and Steel Certifications together with the moulds.

Product after-sales problem First, we will check the problem an

PA66 | Applications and Buyer Notes

PA66 is organized as a sourcing-ready Mold Temperature Controllers reference. The page combines visible product or company data with structured procurement cues so buyers can compare application fit, specifications, quantity, quality requirements and lead-time

Applications

  • Initial shortlist building for related product or supplier options.
  • Specification and application fit review before bulk purchasing.
  • Category, keyword and detail-page comparison before sending an RFQ.

Key specifications

Unit
setBased on visible page data; confirm exact value in the RFQ.

Buyer tips

  • State quantity range and split-delivery needs before price comparison.
  • Add certification, material or inspection standards when they affect acceptance.
  • For time-sensitive projects, include target arrival date and destination.
  • For special applications, describe operating condition, installation environment and duty cycle.

FAQ

What should buyers confirm first?

Confirm application, specification, quantity, destination and lead-time requirements before comparing offers.

Can buyers inquire when specs are incomplete?

Yes. Add model, material, size, use case and inspection needs in the RFQ to make replies comparable.

How should this listing be evaluated?

Check title, category, specifications and related keywords against the actual sourcing requirement.

Source mix: ugc

Key specifications

Unitset

Product sourcing keywords

These terms come from the title, visible copy and specifications, and link into matching aggregate pages.

Continue from this detail page into sourcing structure

These links connect the detail page back to category hubs, procurement aggregates and knowledge pages so new inventory is not isolated.

PlasticMachHub related sourcing paths

PlasticMachHub procurement phrases

PlasticMachHub related product samples